The venue was built in 2004 for the rowing and canoeing events of the 2005 Mediterranean games. The channel is an impressive 1,150m long and 115m wide. The project was completed with a budget of €14.5m financed by the Ministry of Environment, through the Southern Hydrographic Conference and the Provincial Government of Almería.
Kinetic PB are continually enhancing the site, upgrading the facility. This is the best swimming, cycling and running training location in Europe. The climate is the warmest, driest and sunniest location in Spain and continental Europe.
You will find:transition zonebike set up equipment25m indoor pool (1.8m - 2.4m deep) and our 1150m open water swimming channelrunning and cycling routes (on and off road)club house with lounge and changing facilitiesbike storecorporate training facilitiesconditioning gym
Motorway links make the site easily accessible, approximately 45 minutes from Almeria airport, 75 minutes from Murcia and 2 hours from Alicante airport.
You are viewing the text version of this site.
To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.
Need help? check the requirements page.